Installation guide volume 24
ESSENTIALS
ESSENTIALS COLLECTION SUPRA CITADIN 180 GAS FIREPIT
Control panel
Materials required Supra Citadin 180 Block: 16 complete corner block Supra Citadin 180 coping: 8 Rectangular burner CF-2424 : 1
This fireplace is designed with Supra Citadin 180 wallstones and coping.
Cutting chart
*Before permanently installing a Supra Citadin 180 gas fireplace, it is important to plan the positioning of the CONTROL PANEL provided with the CF-2424 burner manufactured by The Outdoor Great Room company. Plan all cuts needed for control panel installation, respecting the minimum distance recom mended for your gas burner. Also remember to provide hose access for the propane tank.
Total number of SUPRA CITADIN 180 BLOCKS required for firepit base: 16 Total number of SUPRA C ITADIN 180 COPINGS required for firepit top (8) SUPRA CITADIN 180 COPING
(4) full copings (4) cut copings
COPINGS D-1 :
Overhead diagram
Exploded view
Square Burner 24” x 24” CF-2424
Elevation
Coping 90
ROW 2
Profil
ROW 1
ROW 2
1.5 rows visible
ROW 1
Level 0
Volume 24 BOLDUC Installation Guide - 59
Made with FlippingBook flipbook maker