WALLSTONES, COLUMNS AND STEPS

SPECIFIC INSTALLATION DETAILS SUPRA CITADIN 180 BLOCK (CONTINUED) 7. Backfilling

After installing the drain behind the wall, fill the space behind every second row of the modules with 3/4 in. (20 mm) clean gravel to a depth of about 8 in (20 cm). Use a membrane to keep the retained soil from contaminating the clean gravel. Repeat these steps up to the desired height. 8. Coping modules Citadin 90 coping modules comprise the top row of a Supra Citadin 180 wall and hang over its front. As these modules are not installed with connectors; they must be glued to the underlying row with a concrete adhesive. 9. Geogrid Installation If the plan requires the installation of a geogrid at a specific height, the Tensar geogrid will be installed by inserting the connectors into the geogrid openings.

Citadin 180 connector with setback.

When cutting the geogrid, the tabs must extend beyond the front of the block by 100 mm when the connector is placed against the transverse bar of the geogrid for a straight wall, and by 80 mm for a battered wall.

Citadin 180 connector without setback.

Transverse bar

Push the geogrid against the connector teeth, then fully insert the connector using a rubber mallet. Note: The transverse bar of the geogrid must be pulled firmly against the connectors before securing the assembly into the block. Geogrid slack can be eliminated by temporarily anchoring its end using stakes or rebar. Once the connectors and the geogrid, when required, are in place, the top of the Citadin 180 blocks must be cleaned before placing the next course. Failure to follow this procedure may cause problems during the placement and leveling of subsequent courses. The “anchored” geogrid can be folded back over the wall face during backfill spreading up to the level of that geogrid.

32 - Volume 26 BOLDUC Installation Guide

Made with FlippingBook - professional solution for displaying marketing and sales documents online